IGC Studio

Home
/
Case Studies
Luxury Architectural Film – W Hotel FTL

A refined 10-year refresh for a luxury hospitality bar

Quick Facts Strip:


Quick Summary:

As part of a 10-year refresh, the W Hotel upgraded its luxury bar to better align with current hospitality design standards. Using architectural film and wallcovering, we transformed the space with warmer tones and refined textures—enhancing the overall guest experience while preserving the bar’s original elegance.

The Challenges

The bar was already a beautiful space, but its last major refresh took place in 2014. Over time, the finishes no longer reflected modern luxury expectations.

Goal:
Elevate and modernize the bar while maintaining its upscale identity.

Problem:
The space felt dated and did not align with current luxury hospitality standards.

Why Now:
As part of a scheduled 10-year refresh, the hotel aimed to enhance the guest experience and remain competitive in a luxury market.

Constraints

This project required a high level of coordination and technical precision.

  • Wallpaper installation over an existing mirrored metal laminate surface

     

  • Fixed reopening deadline with no schedule flexibility

     

  • Limited installation windows to accommodate bar operations

     

  • Tight working areas due to existing furniture and multiple trades on-site


The Solution

We installed high-end architectural film and wallcovering tailored to the bar’s lighting, layout, and daily use.

What We Delivered

  • Material: High-end architectural film

  • Preparation: Thorough surface cleaning, adhesion testing over metal laminate, and protection of surrounding finishes

  • Installation Method: Precision alignment and seam control while working efficiently in tight areas and coordinating with other trades

  • Crew: 8 installers on site over 2 days

Why It Worked

  • The materials added warmth and depth without overwhelming the space

  • Precision installation ensured a clean, built-in appearance

  • Careful coordination allowed the project to stay on schedule with minimal disruption

Implementation Highlights

1
Site Check + Prep

Field measurements were taken to verify actual material requirements against supplied plans, ensuring accuracy before installation.

2
Layout + Alignment

Laser leveling was used throughout the project to keep lines straight, square, and consistently aligned across all surfaces.

3
Installation Day

Our team coordinated closely with other trades to ensure lift availability, avoid workflow conflicts, and maintain a smooth, efficient installation from start to finish.

Results

 

  • Luxury upgrade: The bar now features a warmer, more contemporary aesthetic

     

  • Improved guest experience: Added texture and refinement enhanced the overall atmosphere.

 

  • Efficient execution: Completed within the required timeline while maintaining hotel operations
Before Meets After

Final Reveal

Thinking About a Similar Project?

If your space needs a refined, high-end update that balances design impact with operational efficiency, IGC Studio can help.

Request a Quote

  • Serving South Florida

     

  • Weekday, weekend, and after-hours scheduling available

     

  • Typical response time: within 24 hours

Common Questions About Our Design Services

IGC Studio focuses on high-quality interior design solutions, including wall murals, wallpapers, decorative and frosted films, decorative glass, framed and stretch canvas art, and ceiling graphics tailored to both residential and commercial spaces.